Industrial electrical installations.

Power distribution, cable trays, machine connections, earthing and lightning protection for new plants, extensions and production line relocations, with commissioning, start-up and measurements before handover.

New plants, extensions and line relocations.

An industrial electrical installation brings together the power distribution, cabling, earthing network and machine connections of a production site. Nualux carries out this work in new plants, extensions and line transfers.

The work runs from main switchboards (MLVS) and cable trays to machine connections and the lightning protection system, and ends with start-up.

Production hall with extrusion line and dosing platforms in Russia

What type of job do you have ahead.

Electrical installation of a line in a new plant in Russia

New plant

Installation from scratch, coordinated with the civil works and the arrival of the machines, from the MLVS to the last socket outlet.

Second production line connected to the existing installation in a plant in Brazil

Extension

New lines or halls connected to a running installation, with the work phased so existing production does not stop.

Production line relocated from Spain and assembled in Chile

Line relocation

Line disconnected, labelled, shipped and rewired at the new site, in Portugal or abroad, and returned to service.

What the work includes.

Electrical room with power panels and drives in a plant in Chile

Power distribution

Main low voltage switchboards (MLVS), busbar trunking, sub-distribution boards and isolators along the production halls.

Cable trays suspended above a production line in Chile

Cable trays

Cable trays, cable ladders, wire mesh trays and conduit along steel structures and mezzanines.

Machine panel and power cables connected to an extruder in Chile

Machine connections

Power supplies, control interconnections and sensor wiring for new or relocated lines.

Earth connection on an equipotential bonding bar

Earthing and equipotential bonding

Earth electrodes, equipotential bonding bars and earthing of all exposed metalwork.

Lightning protection air terminal on a factory roof

Lightning protection system (LPS)

Air terminals, down conductors and earth electrodes installed on roofs and façades, with components from specialist manufacturers, and tested on completion.

Line supervision screen during start-up in a plant in Brazil

Commissioning and start-up

Continuity, insulation and protection tests with the HT Fulltest3, energising section by section and start-up support.

What the law says about industrial electrical installations.

A plant’s electrical installations are private installations under Portuguese law. The law sets how they are designed, how they are carried out and who is responsible for them once connected.

Legal framework: Decree-Law no. 96/2017 (private electrical installations), Ordinance no. 949-A/2006 (RTIEBT) and Law no. 14/2015.

Nualux II hands over the installation ready for inspection

The job ends with the measurements, the as-built drawings and the test report that the responsible technician and the inspection body will ask for.

How an installation works.

  1. Design review and planning

    The team reviews the site plans, the single-line diagram, machine power ratings and delivery dates, and defines the cable routes and work phases.

  2. Cable trays and earthing

    The team installs cable trays and ladders, lays the earthing network and mounts the distribution boards.

  3. Cable pulling and termination

    Power and control cables are pulled, dressed and terminated in the main switchboards and the machine panels.

  4. Testing and start-up

    The team measures the installation with the HT Fulltest3, energises it section by section, supports the line start-up and hands over the test report.

Request a quote

What you receive after each visit.

The installation is handed over with the documents the plant needs for inspection and operation.

Test report

Continuity, insulation, earthing and protection device operation measured.

As-built drawings

Plans and diagrams updated to match what was actually installed.

Lightning protection measurements

Earth resistance measured at each test joint of the lightning protection system.

Production line returned to service in Chile
Job · Spain › Chile

Production line relocated and returned to service.

Related services

What usually comes before and after the installation.

All services

Request a quote.

Make your first contact here for a quote. No obligation.

Questions about industrial electrical installations

It installs, modifies and tests the electrical systems of factories and production sites: main switchboards (MLVS), cable trays, machine connections, earthing and lightning protection. Nualux also carries out commissioning, start-up and the final measurements before handover.

Portuguese Decree-Law no. 96/2017 requires a technician responsible for operating the electrical installation. Where there is no responsible technician, the installation is subject to periodic inspection by an inspection body.

It depends on the applicable regulations and on a risk assessment that considers the size of the building, its location, its contents and the impact of a shutdown. Sites with flammable materials or sensitive electronics often need this system.

It gives the lightning current a controlled path to the ground. Air terminals or a mesh on the roof intercept the strike, down conductors carry the current down the outside of the building and earth electrodes disperse it into the ground.

EN 62305-3 calls for an annual visual inspection and a full inspection every 2 years for protection levels I and II, and every 2 and 4 years for levels III and IV. The system is also checked after a known direct strike or changes to the roof.

With the circuit de-energised and sensitive electronic equipment disconnected. An instrument such as the HT Fulltest3 applies a DC test voltage between the conductors and earth and displays the insulation resistance in megohms.

Yes. Nualux has installed and commissioned production lines in Spain, Chile, Brazil and Russia, with the team travelling from its workshop.

It depends on the floor area, installed power, number of machines to connect, length of cable trays and the timeline. To prepare a quote, Nualux needs the plans, the single-line diagram and the machine list.