Factories
Packaging film plant
Electrical work in a new production hall: cable trays and equipment connections.
- Service
- Electrical installation
- Location
- Russia

Electrical, automation and maintenance projects delivered in factories and infrastructure
Factories
Electrical work in a new production hall: cable trays and equipment connections.

Factories
Power, control, commissioning and start-up on site for a new extrusion line.

Factories
Disconnected in Spain, shipped, rewired and returned to service in Chile.

Control panels
Built, CE marked and tested in the Nualux factory before shipping.

Energy
Annual maintenance with cleaning, retightening, oil analysis and earth resistance testing.

Energy
Work at the outlet of the hydropower plant, with rope access on the dam face and a support boat on the reservoir.

Control panels
Panel wiring and assembly in the Nualux factory for a new extrusion line in Brazil.

Ports
Electrical and automation maintenance on STS and RTG port cranes.

The same team handles the design, the panel, the installation and the maintenance. Choose a service to see how Nualux works.
New plants, extensions and line transfers, from the main LV switchboard to the machine connections.
View the serviceAssembled, wired and tested in the Nualux factory, with CE marking.
View the serviceAnnual maintenance, earth resistance testing and oil analysis, with the record ready for inspection.
View the servicePreventive and corrective work on panels, motors and automation, planned for the plant's shutdowns.
View the serviceElectrical and automation work on the generating units, keeping the plant offline for as short a time as possible.
View the serviceElectrical and automation maintenance on STS and RTG cranes, in the windows between vessel calls.
View the serviceCameras, recording and cabling in factories and warehouses, within data protection rules.
View the serviceInstallation, testing and maintenance of fire detection and alarm systems to EN 54.
View the service





Every job ends with insulation and continuity tests carried out with the HT Fulltest3. The report stays with the client, ready for when the auditor asks for it.
Send Nualux the location, the shutdown window and what has to keep running during the work. With that, the team prepares a proposed method and timeline.