Preventive and corrective maintenance of electrical installations, control panels, PLCs and variable speed drives. Always planned around the client’s production schedule.
Industrial electrical maintenance is the scheduled inspection, testing and repair of a plant’s power distribution, control panels and automation. Nualux carries out this work for production sites.
With the client’s plant running, the team carries out a thermal imaging survey of the panels to find hot spots.
When the plant stops, the circuits are isolated, the connections retightened, the panels cleaned and insulation and continuity measured with the HT Fulltest3. Between visits, Nualux provides breakdown support.
Most plants need all three, in different proportions. The weight of each depends on the age of the installation and the breakdown history.
Scheduled tasks: cleaning, retightening connections, checking protection devices and testing. It reduces recurring breakdowns and builds a history for comparison.
Decides when to intervene based on measurements, such as thermal imaging of panels under load. It finds the connection that is overheating before it stops the line.
Diagnosis and repair after a failure. When a breakdown stops the line, the priority is to restore production and record the cause.
Isolation, cleaning, retightening of connections and busbars, filter replacement and checking of protection device settings.
Inspection and fault diagnosis on PLCs, I/O modules, variable speed drives and field sensors.
Insulation resistance, continuity, earth resistance and loop impedance measured with the HT Fulltest3.
Terminal boxes, tightening torques, winding insulation and protection of the motors that drive the lines.
Larger jobs, such as panel replacement and rewiring, carried out during holiday shutdowns or at weekends.
Checking and retightening the earth connections of machines, metal structures and cable trays.
Portuguese Decree-Law no. 50/2005 treats any machine, device, tool or installation used at work as work equipment. The plant’s electrical installation falls within that definition.
Legal framework: Decree-Law no. 50/2005, articles 6 and 7. Plants with their own transformer substation also have the obligations of Decree-Law no. 96/2017.
Each visit ends with the measured values, the faults found and the work done, dated and signed. That document shows an auditor or the insurer that the electrical installation has been checked.
Panels and equipment are surveyed together with the plant's maintenance team, and each task is fitted into a production shutdown, a weekend or a shift change.
Before the shutdown, the team carries out a thermal imaging survey of the main switchboards (MLVS) and motor control centres (MCC) to see where to intervene.
The team isolates the circuits, retightens the connections, cleans the enclosures, checks PLCs and drives, and measures insulation with the HT Fulltest3.
Nualux hands over the report with thermograms, measured values and the faults to fix at the next shutdown.






Each visit ends with documents you can show to an auditor, your insurer or plant management. The readings sit next to those from the previous visit, so the trend is visible.
Insulation, continuity, earth resistance and loop impedance measured with the HT Fulltest3.
Thermal images of the panels under load, with the temperature and location of each hot spot.
What remains to be fixed, in order of priority, so the materials for the next shutdown can be prepared.
Plant maintenance overlaps with these services.
Make your first contact here for a quote. No obligation.
It is the scheduled inspection, testing and repair of a plant’s power distribution network, control panels and automation systems. It finds loose connections, worn contacts, damaged cables and insulation faults before they stop a production line.
The team checks terminal tightening torque, contactor wear, protection settings, cabinet ventilation and cable condition. It measures insulation resistance, continuity and earth resistance with the HT Fulltest3, checks PLCs and variable speed drives, and records everything in a written report.
It is a planned stop in production to carry out work that cannot be done while the plant is running. On the electrical side, it is the window used to isolate the main switchboards (MLVS), retighten busbars, clean panels and replace switchgear or cables.
Thermal imaging uses an infrared camera to measure the temperature of control panels under load. Loose or oxidised connections and overloaded conductors run hotter than the rest and show up in the image without shutting the installation down.
It pays off when an unplanned stop is expensive. Thermal imaging finds deteriorating connections while the plant is producing, and gives time to order the materials and carry out the repair at the next planned shutdown.
Preventive maintenance carries out tasks at set intervals, such as cleaning, retightening and testing. Corrective maintenance repairs equipment after a failure. Condition-based maintenance uses measurements, such as thermal imaging, to decide when to intervene based on the actual condition of the equipment.
Yes. Thermal imaging and visual inspection are done with the panels under load. Work that requires de-energised circuits is left for planned shutdowns, weekends or shift changes, agreed with the plant team.
It depends on the number of control panels, the size of the installation, the frequency of visits and the shutdown windows available. To prepare a quote, Nualux needs the location, the list of panels and the date of the next shutdown.