Transformer substation construction and maintenance.

Construction of medium voltage transformer substations and full annual maintenance.

Medium voltage transformer substations for industry.

A transformer substation receives the medium voltage supply from the distribution grid and steps it down to the low voltage that feeds the plant floor. Nualux builds these substations for industrial plants and carries out their annual maintenance.

The annual intervention always follows the same process. The team de-energises the substation, cleans it, retightens every bolted connection and measures the earth resistance with the HT Fulltest3 whenever required. Finally, it takes a transformer oil sample for laboratory analysis. The results are entered in the substation logbook, so each reading can be compared with the previous year’s.

Prefabricated transformer substation next to a plant, with a technician at the medium voltage switchgear

What type of substation does your plant have.

Construction and maintenance depend on the type of installation. In Portugal, the term electrical substation is reserved for high voltage installations. The installation that supplies a plant is a transformer substation (posto de transformação), and when it belongs to the company it is called a private substation.

Masonry building transformer substation next to a plant

Building-type substation

Medium voltage switchgear, transformer and main low voltage switchboard inside a masonry building built on site. It leaves room for switching operations and for increasing capacity later.

Prefabricated concrete compact transformer substation

Compact or prefabricated substation

Concrete or metal enclosure assembled in the factory and delivered ready to connect. It takes up less space and installation on site is faster.

Pole-mounted transformer substation

Pole-mounted substation

Transformer mounted on a pole, connected to the overhead medium voltage line, for lower power ratings. Maintenance requires a shutdown and work at height.

The maintenance routine described below applies to all three types.

Construction and Maintenance Process.

Prefabricated transformer substation being lifted by crane onto its foundation

Substation construction

Medium voltage switchgear, transformer installation, main low voltage switchboards (MLVS) and secondary cabling for new industrial transformer substations.

Clean, well-lit medium voltage switchgear room

Cleaning and retightening

Removal of dust and moisture from switchgear cubicles and insulators, and restoring the tightening torque on every bolted connection.

Taking a transformer oil sample

Transformer oil analysis

Oil sample taken on site and sent to a laboratory to check water content, acidity and dielectric strength.

Technician measuring earth resistance next to a transformer substation

Earth resistance testing

Earth resistance and continuity measured with the HT Fulltest3, comparing the values with the previous year’s records.

Recording measurements in the transformer substation logbook

Substation logbook

Written record of every visit, measurement and repair in the logbook kept inside the transformer substation.

Replacing a medium voltage cable termination in a cubicle

Corrective repairs

Replacement of worn components, damaged cable terminations and faulty devices when a failure occurs between annual visits.

Obligations of a private substation owner.

When a plant is supplied by its own transformer substation, Portuguese law requires more than equipment maintenance.

Legal framework: Decree-Law no. 96/2017, which sets the rules for private electrical installations, and Law no. 14/2015.

Maintenance and the responsible technician work together

The responsible technician inspects the installation and answers for its operation. The annual maintenance carries out the work on the equipment and leaves in the substation logbook the measurements and repairs the technician needs to check at the next inspection.

How the annual maintenance works.

  1. Shutdown planning

    The team reviews the single-line diagram, the latest logbook entries and the planned shutdown window, and agrees the maintenance plan and switching sequence with the plant's maintenance team.

  2. Isolation and earthing

    The transformer substation is taken out of service, the absence of voltage is verified, and it is locked off and earthed before any cubicle is opened.

  3. Cleaning, torque and sampling

    Cleaning of cubicles and insulators, torque checks, oil sampling and earth resistance measurement with the HT Fulltest3.

  4. Re-energising and records

    Power is restored in the presence of the client's team. Nualux hands over the test report and fills in the transformer substation logbook.

Request a quote

What you receive at the end.

Each intervention ends with documents you can show to the responsible technician, your insurer or an auditor, with all the details they need

Test report

Earth resistance and continuity measured with the HT Fulltest3, compared with the previous year’s values.

Oil analysis

Laboratory results for the water content, acidity and dielectric strength of the transformer oil.

Updated substation logbook

Written record of the visit, the measurements and the repairs.

Electrician checking medium voltage switchgear in a transformer substation

Annual maintenance of a transformer substation.

Related services

The transformer substation feeds the rest of the installation. These are the jobs that usually come next.

All services

Request a quote.

Request a contact for a quote here. No commitment.

Questions about transformer substations

A transformer substation steps the medium voltage supply from the distribution grid down to low voltage, feeding the plant floor and the buildings. It houses the medium voltage switchgear, the power transformer, the main low voltage switchboards (MLVS) and the protection devices that isolate a fault before it spreads.

Annual maintenance by Nualux covers de-energising the substation, cleaning cubicles and insulators, retightening bolted connections, measuring earth resistance and taking a transformer oil sample for laboratory analysis. All values are recorded in the logbook kept at the transformer substation.

Oil analysis shows the internal condition of the transformer without opening the tank. The oil cools and insulates the windings, so laboratory tests for moisture, acidity and dielectric strength detect insulation ageing or overheating before they lead to a failure.

Oil is usually sampled once a year, during the annual maintenance visit to the transformer substation. Transformers running at high temperatures or close to rated load may need shorter intervals.

The earth resistance test measures how well the substation’s earthing system can discharge a fault current into the ground. Nualux carries out this measurement with an HT Fulltest3. A low, stable value allows the protection devices to trip in the event of a fault and keeps touch voltages within safe limits.

The transformer is only the electrical machine that changes the voltage level. The transformer substation is the complete installation: medium voltage switchgear, protection devices, transformer, main low voltage switchboards (MLVS), earthing system and the building or enclosure that houses them.

Yes. Companies supplied by a private transformer substation must have a technician responsible for operating the electrical installation. That technician inspects the installation as often as it requires, at least twice a year. The inspections do not replace the preventive maintenance plan.

It depends on the power rating and number of transformers, the type of substation (building-type, compact or pole-mounted), site access, the available shutdown window and any repairs needed. To prepare a quote, Nualux needs the location, the single-line diagram and the record of the last inspection.

In a building-type substation, the equipment sits inside a masonry building built on site. A compact substation arrives prefabricated, in a concrete or metal enclosure assembled in the factory, and takes up less space. The annual maintenance routine is the same for both.